Idler And Drive Rollers - Toro ProPass 200 Service Manual

Hide thumbs Also See for ProPass 200:
Table of Contents

Advertisement

Idler and Drive Rollers

RIGHT
FRONT
5
1. LH conveyor frame assembly
2. Conveyor bed assembly
3. RH conveyor frame assembly
4. Floor conveyor belt
To remove and replace the idler and drive rollers, remov-
al of the left side conveyor frame and the floor conveyor
belt is necessary. Once these items are removed, either
roller can be removed from the bearing in the right side
conveyor frame.
Chassis
3
12
Figure 12
5. Idler roller
6. Drive roller
7. Scraper assembly
8. Cap screw (4 used)
Page 5 - - 12
4
6
2
11
9. Flat washer (8 used)
10. Lock nut (4 used)
11. Flange head screw (10 used)
12. Flange nut (10 used)
7
8
9
9
10
1
ProPass 200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents