Siemens HiPath 5000 Service Manual page 971

Hide thumbs Also See for HiPath 5000:
Table of Contents

Advertisement

Table 12-1
Startup Rules for Inserting and Removing Boards
If
Replacing board with
over-equipped board of
same type
Replacing with a differ-
ent board type
If you initiate a system reload on a system updated as described above, the system
>
must be reset after the updated CDB has been installed. The reset synchronizes the
port placement sequence in the system with that of the CDB.
P31003-H3560-S403-54-7620, 09/05
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
Board is activated. The old station range is activated and the ports
associated with the new board are inserted at the end. The ports
are split if there is no contiguous station range available.
In the case of subscriber line modules, you can use HiPath 3000
Manager E to retain the old station data by copying it to the new
board, or you can delete it and reset the default state. Copying is
not possible for trunk boards.
The system does not automatically activate the board.
After removing the old board, you can delete it from the database
using HiPath 3000 Manager E or Assistant T.
After you have inserted the new board, the system activates it as if
it had been inserted into a free slot. However, the CDB area used
by the old board is left as a gap.
In the case of subscriber line modules, you can use HiPath 3000
Manager E to retain the old station data by copying it to the new
board, or you can delete it and reset the default state. Copying is
not possible for trunk boards.
Service and Maintenance Tasks
Then
service.fm
Service
12-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 3000Hipath 3800

Table of Contents