Performing A Visual Inspection - Siemens HiPath 5000 Service Manual

Hide thumbs Also See for HiPath 5000:
Table of Contents

Advertisement

inst_h3.fm
Installing HiPath 3000
Installing HiPath 3750, HiPath 3700
4.3.9

Performing a Visual Inspection

Introduction
Before starting up the system, you must perform a visual inspection of the hardware, cables,
and the power supply. The procedure is shown in Table 4-18. The visual inspection must be
performed while the system is disconnected from the power supply.
Caution
7
Before beginning work, make sure that the system is grounded and disconnected
from the power supply.
Observe the measures for protecting electrostatically sensitive devices (see Page 1-
9).
Visual Inspection Procedure
Table 4-18
Visual Inspection Procedure
Step
1.
Compare the slots for the in-
stalled boards with the board
assignment map.
2.
Check all boards for proper
seating.
3.
Check the local line voltage.
After finishing the visual inspection, you can begin starting up the HiPath 3750 or Hi-
>
Path 3700 system as described in Chapter 5.
4-164
Activity
HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
Resources/
Remarks
Board assignment
map
See Page 4-162
Check the additional
mechanical attach-
ments for the UPSM.
Digital multimeter
P31003-H3560-S403-54-7620, 09/05
Action
Correct the board config-
uration and notify the
sales department.
Reconnect and fasten the
boards.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hipath 3000Hipath 3800

Table of Contents