Preliminary Operations - ABB VSN300 Product Manual

Wifi logger card
Hide thumbs Also See for VSN300:
Table of Contents

Advertisement

P
reliminary operations
Some parts may be very hot and could cause burns.
Some inverter parts may be subject to voltages that could be hazardous for the operator.
Before performing any work on the inverter, follow the procedure for turning off the inverter.
Before attempting any work on the inverter, wait enough time for the stored energy to be
discharged.
DC
DC
AC
AC
10
GFI
ESC
UP
DOWN
ENTER
POWER
ALARM
DC
DC
AC
AC
UP
DOWN
ENTER
POWER
ALARM
GFI
ESC
1
R S T N G
DC
DC
AC
AC
POWER
ALARM
GFI
ESC
UP
DOWN
ENTER
1
R S T N G
1
R S T N G
Installation of the VSN300 Wifi Logger Card must be carried out inside
the inverter and therefore the inverter must be completely disengaged.
For the correct disengagement procedure and the subsequent ope-
ning of the cover, refer to the manual of the specific inverter.
By way of example, the figures to the side show the areas subject to
voltage inside the ABB TRIO inverter:
- Red: areas subject to input voltage (DC)
- Orange: areas subject to output voltage (AC)
- Green: areas subject to low voltage (selv)
• Disconnect any power supplies that may be connected to the configu-
rable relay.
• The figure on the left shows the areas subject to voltage in the inverter
under normal operating conditions.
• Open the DC disconnect switch on the outside of the inverter.
• Disconnect the grid voltage (by switching off the protective device
upstream of the inverter).
Under these conditions the inverter does not have any hazardous
voltages and all areas may be freely accessed.
- 24 -
5 - Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents