Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
2)
Cut the straps using diagonal pliers.
3)
Cut the tapes along the seams of the carton cover using a knife. To avoid
damaging equipment inside, do not apply too much force.
4)
Open the carton and take out the foam materials.
5)
View the labels of boards, and check whether the number of boards is consistent
with what is specified on the label of the carton. Then, take out the boards.
6)
Check the number and type of boards against the Packing List, and then accept
them.
Figure 1-4 shows the carton packed with boards.
(1) Board label
(4) Anti-static bag
(7) Carton label
Figure 1-4 The carton packed with boards
(2) Foam materials
(5) Board box
(8) Strap
Huawei Technologies Proprietary
1-9
Chapter 1 Installation Preparations
(3) Board
(6) Pressure-sensitive adhesive tape
(9) Carton