Huawei BTS3606 Installation Manual page 66

Airbridge cdma base station
Hide thumbs Also See for BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
2)
Put the cold-pressed terminal of the –48V power cable through the
cable-bundling strip beside the terminal block.
3)
Loosen the screw in the small round hole (such as –48V connecting hole) on the
power input side of the terminal block using a flat-head screwdriver.
4)
Insert the cold-pressed terminal of the –48V power cable into –48V connecting
hole of the terminal block.
5)
Tighten the screw in the –48V connecting hole using a flat-head screwdriver (that
is, reverse the step 3 above) and fix the power cable to the terminal block.
6)
Bind power cables to the cable-bundling strip using cable ties.
II. Connecting Power Grounding Cables (Black) to the Cabinet
To connect power grounding cables to the cabinet, proceed as follows:
1)
Insert the cold-pressed terminal of a power grounding cable (35 mm2 black
cable) to the GND terminal on the terminal block of power input on the top of the
cabinet, as shown in Figure 4-12.
Figure 4-12 Installing power cables
2)
Connect the cables by referring to I. Connecting –48 V Power Cable (Blue) to the
Cabinet.
3)
Route the blue cables and black cables along the cable rack in order.
4)
Connect the other end of the cable to the corresponding binding post of the
power distribution cabinet.
Huawei Technologies Proprietary
4-16
Chapter 4 Installing Cables

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3606a

Table of Contents