Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Start
Position the cabinet
Prepare U-bar
support
Fix the U-bar
support
Install the
low er support
Lev el the
low er support
Conduct
insulation test
End
Figure 2-15 Installation flowchart on cement floor without sufficient bearing capacity

2.6.2 Installation Procedure

The following describes the procedure of installing assemblies on the cement floor
with poor bearing capacity.
I. Positioning the Cabinet
To position the cabinet, proceed as follows:
1)
Determine the installation position of the cabinet according to the positioning
dimensions specified in the project design and construction blueprint.
2)
Position the U-bar support according to the cabinet layout.
3)
Measure off several points with a measuring tape.
4)
Draw two straight parallel benchmark lines with a marker. The spacing between
the two straight lines is 630 mm (24.8 in.).
5)
Determine the position of the first hole for the U-bar support on the two lines
according to the design requirement. Take this hole as the benchmark point to
mark the rest installation holes of the support one by one.
OK
Check the
insulating parts
Failed
OK
Huawei Technologies Proprietary
Chapter 2 Installing Cabinet Assemblies
Damaged
or missing
Repair/replace
the parts
Repeat
insulation test
2-18