Method For Calculating Safety Response Time Of Cc-Link Ie Field Network - Mitsubishi Electric MELSEC iQ-R Series Safety Manual

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

Method for calculating safety response time of CC-Link IE Field
Network
CC-Link IE Field Network transmission time
The following shows a calculation formula for the transmission time of the CC-Link IE Field Network from safety input to safety
output.
(SCcpu  3) + (SRref  4.5) + (RM  2) + SRin + SRout + (n  4)
SCcpu: Safety cycle time of the Safety CPU
SRref: Safety remote station refresh response processing time
RM: Safety refresh monitoring time
SRin: Safety remote I/O module input response time
SRout: Safety remote I/O module output response time
n: The smaller value of (1) and (2) below
(1) RM - TMmst - (TMrmt  2) + a
(2) RM - (TMmst  2) - TMrmt + c
TMmst: Transmission interval monitoring time of the master station
TMrmt: Transmission interval monitoring time of the remote I/O module
a: If a station set to active side is the RJ71GF11-T2, then a = TMmst - b. For other cases, a = 0.
b: Value rounds up the calculation results of the TMmst2 to a multiple of the safety cycle time of the master station.
c: If a station set to passive side is either the RJ71GF11-T2 or Z2GFSS2-32D, then c = TMrmt - d For other cases, c = 0.
d: Value rounds up the calculation results of the TMrmt  2 to a multiple of the safety cycle time of the local station (if
NZ2GFSS2-32D, safety refresh response processing time)
*1 For the safety remote I/O module used, refer to the user's manual.
*2 Calculation examples for b and d
When transmission interval monitoring time = 24ms, and safety cycle time = 10ms, the calculation result is 20, rounded up 24  2 = 12 to
a multiple of 10.
APPX
236
Appendix 1 Calculating Safety Response Time for System Configured with a Safety CPU
*1
*1
*1
*2
*2

Advertisement

Table of Contents
loading

Table of Contents