Siemens Argus 7SR21 Technical Manual page 552

Overcurrent relay
Hide thumbs Also See for Argus 7SR21:
Table of Contents

Advertisement

7SR210 & 7SR220 Commissioning & Maintenance Guide
Apply 2x setting current if possible and record operating time
Is
DTL
P.U. Current
Operate Time
Phase
Tolerance
Tolerance
(Amps)
(sec)
Amps
2 x Is
REF
It is also desirable to check the operating voltage achieved with the setting resistor and all parallel CTs connected
but de-energised. A higher capacity test set will be required for this test. Adequate current must be supplied to
provide the magnetising current of all connected CTs. Precautions should be taken to ensure that no personnel
are at risk of contact with any of the energised secondary wiring during the test.
Settings Data Voltage Setting
Measured
To complete testing of the REF requires primary injection through the phase and residual (REF) CT in series to
simulate an out of zone fault and ensure stability of the relay. The test can then be repeated with the REF CT
secondary connections reversed to prove operation.
1.1.1.1
Element Blocking
The Restricted Earth Fault element can be blocked by Binary Input Inhibit. This functionality should be checked.
Element
BI Inhibits
64H
Check correct indication, trip output, alarm contacts, waveform record.
Check that any shorting links are removed after testing.
Page 40 of 82
© 2013 Siemens Protection Devices Limited

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Argus 7sr22

Table of Contents