Vertically Side By Side; Prepare For Installation; Unpack The Drive - ABB ACH580 Series Installation, Operation And Maintenance Manual

Hide thumbs Also See for ACH580 Series:
Table of Contents

Advertisement

ACH580 Installation, Operation and Maintenance Manual

Vertically side by side

2. Prepare for installation

Lifting R1...R4
Lift the drive only by the chassis.
Lifting R5...R8
1. Use a pallet truck to move the transport package/enclosure to the installation site.
WARNING! Frames R5...R9: Lift the drive with a lifting device. Use the lifting eyes of
the drive. The drive is heavy and its center of gravity is high. An overturning
drive can cause physical injury.
2. Use a hoist to lift the drive. (Do not place drive in final position until mounting site is
prepared.)

Unpack the drive

1. Unpack the drive.
2. Check for any damage and notify the shipper immediately if damaged components
are found.
3. Check the contents against the order and the shipping label to verify that all parts
have been received.
c = 0
a
a
b
b
Vertical installation side by side - Free space
Frame
Above (a)
size
mm
in.
2)
R1
200
7.87
2)
R2
200
7.87
2)
R3
200
7.87
R4
200
7.87
R5
200
7.87
R6
200
7.87
R7
200
7.87
R8
200
7.87
R9
200
7.87
1) Free space above is measured from the frame, not from the hood used in
UL (NEMA) Type 12 frames.
Note: The height of the hood for frames R4 and R9 exceeds the requirement of
free space above for these frames.
2)
Free space below is always measured from the drive frame, not from the
cable box.
1)
Below (b)
Between (c)
mm
in.
mm
in.
200
7.87
0
200
7.87
0
200
7.87
0
200
7.87
0
200
7.87
0
300
11.81
0
300
11.81
0
300
11.81
0
300
11.81
0
ACH580-01 Installation
9
0
0
0
0
0
0
0
0
0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents