Installing The Cartridge Group - ABB TPS48-H33 Operation Manual

Hide thumbs Also See for TPS48-H33:
Table of Contents

Advertisement

Operation Manual / 4 Product description / TPS44-H.. - TPS52-H..
9
Dismantling and fitting
9.12

Installing the cartridge group

Lifting the cartridge group and rotating it by 90°
Figure 31: Lifting the cartridge group and rotating it by 90°
1. Loosen and remove nuts.
2. Lift the cartridge group out of the service support (90012).
3. Insert the screws of the service support from above and fit ring nuts (VRM) with washers.
4. Attach lifting gear to the ring nuts (VRM).
5. Lift cartridge group at the side of the ring nuts (VRM) and turn it into a vertical position.
Use edge guard between turbines and lifting gear.
© Copyright 2016 ABB. All rights reserved.
HZTL4037_EN
Page 75 / 99
Revision A
August 2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents