Inspection Procedures - ABB TPS48-H33 Operation Manual

Hide thumbs Also See for TPS48-H33:
Table of Contents

Advertisement

Operation Manual / 4 Product description / TPS44-H.. - TPS52-H..
3
Commissioning
3.2

Inspection procedures

3.2.1
Introduction
Inspection procedures include preventative visual controls, monitoring and measuring work
before and during commissioning. Inspection procedures enable changes to the turbocharger
to be detected. Engine damage can be prevented.
3.2.2
Checks before commissioning
Filter mat (if available)
Check for damage and contamination.
Lubricating system
Contaminated oil
Serious damage to engine or property can be caused by dirt and solid mate-
rial particles in the oil.
CAUTION
At initial commissioning and after all service work, the complete lubricating
system must be thoroughly flushed with warm oil.
Use special running-in filters when running in the engine and after all ser-
vice work on the lubricating system.
Check that the oil filter is clean before commissioning.
Adhere to lubricating oil pressure at the inlet.
Adhere to lubricating oil temperature at the inlet.
For permissible values, see chapter Monitoring operation [➙ 23].
Warning plates
Check whether warning plates are present and legible.
Check whether the protective sheets have been removed.
© Copyright 2016 ABB. All rights reserved.
HZTL4037_EN
Page 20 / 99
Revision A
August 2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents