Washing All The Ise Lines - Siemens ADVIA 2400 Operator's Manual

Chemistry system
Hide thumbs Also See for ADVIA 2400:
Table of Contents

Advertisement

18. When the operation mode returns to READY, move the WUD/DWUD wash head on
top of the WUD/DWUD assembly and secure it by tightening the 4-mm captive hex
screw.
19. Remove the tray and paper towels from the system.
20. Repeat this procedure from step 2 for the other wash head, if needed, and then
proceed to step 21.
21. Exit the JEOL Maintenance window.
22. Run a Startup Wash (WASH3) procedure on the system, then verify proper hydraulic
operation and mechanical alignment of the WUD/DWUD assemblies during the
Startup Wash.
23. Run your laboratory's quality control material and verify the results are within
acceptable ranges.

Washing all the ISE lines

Materials required:
2 clean, empty buffer bottles
Probe Wash 3 solution
Dummy electrode
Phillips head screwdriver
Time: 15 minutes
Analyzer mode: Manual operation
1. At the Menu Panel, select Maint., then select ISE Operation.
2. In the Period.wash area, select OFF, then select Set.
3. Open the front doors and replace the buffer solution (
containing 500 mL of deionized water.
Figurer 5-36. Location of ISE Buffer bottle
4. Loosen the thumb screw and lift the ISE cover.
5. Disconnect the electrode connectors.
6. Remove the thumbscrew (
block containing the electrode.
Maintenance
BIOHAZARD
Wear personal protective
equipment.
Use universal precautions.
1) ISE buffer bottle
2) RRV (Reaction) bath oil bottle
3) Isotonic saline diluent bottle
4) Cuvette detergent bottle
5) Cell conditioner bottle
) to release the plate that secures the electrodes and the
1
) with another buffer bottle
1
155

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents