Huawei Airbridge BTS3606E Commissioning Manual page 5

Table of Contents

Advertisement

Airbridge BTS3606E&3606AE
System Commissioning Guide
Table 1-1 Tools for BTS commissioning ............................................................................................................1-2
Table 3-1 Symptom of board initialization .........................................................................................................3-4
Table 3-2 Indicator status during the OML setup ...............................................................................................3-6
Table 3-3 Indicator status when the BTS downloads data configuration files....................................................3-7
Table 3-4 Parameter associated with the forward power test............................................................................3-23
Table 3-5 Parameters associated with the reverse RSSI test.............................................................................3-26
Table 3-6 Conditions for testing the packet data downlink rate of a user .........................................................3-30
Table 4-1 Handling board alarms........................................................................................................................4-2
Issue 02 (2006-10-10)
Huawei Technologies Proprietary
Tables
Tables
v

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606ae

Table of Contents