Chapter 2 Preparations
7.
Attach Top Cover.
Refer to Chapter 2 (1.10 Installing Top Cover).
8.
Mount the server onto the rack.
Refer to Chapter 2 (2.1 Installation).
9.
Install hard disk drives
Refer to Chapter 2 (1.11 Hard Disk Drive).
This is the end of the installation or removal procedures for internal optional devices.
Continue the setup with reference to Chapter 2 (2.2 Connection).
Express5800/E120d-1 User's Guide
1. Installing Internal Optional Devices
47