Requirements For Laying Out Cables - Huawei PowerCube 5000 Installation Manual

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
Procedure
Step 1 Check the total number of goods against the packing list attached to each packing case.
If...
The total number of goods is consistent with
that on the packing list.
The total number of goods is inconsistent
with that on the packing list.
Step 2 Check each packing case.
If...
The packing case is intact.
The packing case is severely damaged or
water intrudes into the packing case.
Step 3 Check the number and types of devices in each packing case against the packing list.
If...
The number and types of devices are
consistent with that on the packing list.
Any device is missing, damaged, or of a
wrong type.
To protect devices and facilitate future problem diagnosis, store unpacked devices and
packing materials indoors. Take photos of the storage site, any rusty or corroded devices, and
the packing cases and materials. Keep the photos for future reference.
----End

2.5 Requirements for Laying Out Cables

Lay out cables according to the following requirements to avoid signal interference.
Issue 03 (2020-04-10)
Ensure that components do not collide with doors, walls, or shelves.
Wear clean gloves. Do not touch components with bare hands or wet or dirty gloves.
If some of the cables described below do not need to be installed onsite, ignore the requirements for
laying out such cables.
Copyright © Huawei Technologies Co., Ltd.
2 Installation Preparations
Then...
Go to
Step
2.
Find the cause and contact the local Huawei
office.
Then...
Go to
Step
3.
Find the cause and contact the local Huawei
office.
Then...
Sign on the Packing List with the customer.
Contact the local Huawei office.
18