Shutdown And Power-Off; Shutting Down And Powering Off A Single System - Huawei PowerCube 5000 Installation Manual

Hide thumbs Also See for PowerCube 5000:
Table of Contents

Advertisement

PowerCube 5000 (SUN2000-150KTL-S0)
Installation Guide
Figure 9-10 BIM
(1) RUN/ALM indicator
Step 3 Perform networking operations on the next BIM only after networking for the previous BIM
is successful. Repeat
BIMs need to be networked in ascending order of battery number.
Step 4 Hold down the networking switch on the CIM for 2s. When the RF_Z indicator on the CIM
turns from blinking green at super short intervals to blinking green at long intervals, the
networking is complete.
Step 5 (Optional) If multiple CIMs are cascaded, repeat
other CIMs and BIMs.
----End

9.7 Shutdown and Power-Off

9.7.1 Shutting Down and Powering Off a Single System

Prerequisites
Ensure that the output load is transferred or there is no major load so that system power-off is
allowed. Once the integrated equipment is shut down, there is no power output from the
output end.
Issue 03 (2020-04-10)
Step 2
After the networking is complete, if the CIM ALM indicator is steady on, the number of devices online
is less than the number of BIM nodes. Check that the number of BIMs is correctly set and that the BIM
is successfully networked.
Copyright © Huawei Technologies Co., Ltd.
(2) Networking switch
to add other BIMs to the CIM network.
Step 1
9 Power-on and Commissioning
to
Step 4
to perform networking for
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-150ktl-s0

Table of Contents