Yamaha YZF-R1 Series Service Manual page 67

Hide thumbs Also See for YZF-R1 Series:
Table of Contents

Advertisement

1. Auxiliary light lead
2. Steering damper solenoid coupler
3. Intake solenoid lead (sub-wire harness)
4. Steering damper solenoid lead
5. Front turn signal/position light lead (right)
6. Meter assembly
7. Meter assembly coupler
8. Intake solenoid vacuum hose
9. Front turn signal/position light lead (left)
10. Wire harness
11. Headlight assembly
12. Headlight cover
13. Fuse box 2
14. Front cowling
A. Route the auxiliary light lead under the wire
harness.
B. Place the steering damper solenoid lead and
intake solenoid lead (sub-wire harness) in the gap
between the front cowling and front cowling
assembly stay.
C. Route the front turn signal/position light lead (right)
under the steering damper solenoid lead and
intake solenoid lead (sub-wire harness).
D. To front turn signal/position light (right)
E. Install the holder on the steering damper solenoid
lead to the curved section of the slit used for
connecting the lead in the headlight assembly.
F. Install the meter assembly coupler and coupler
cover securely to the meter assembly. Make sure
that the edges of the coupler cover are not rolled
up.
G. Fasten the intake solenoid vacuum hose with the
holders on the wire harness (2 locations).
H. Insert the projection on the wire harness holder
into the hole in the side cover bracket from the
inside.
I.
To front turn signal/position light (left)
J. Fasten the intake solenoid vacuum hose, front turn
signal/position light lead (left), and auxiliary light
lead with the holder. Position the holder to the
outside of and above the head light control unit
holder. The catch of the holder may be facing in
any direction.
K. Face the holder on the steering damper solenoid
lead downward, and then install the holder
completely onto the rib of the headlight assembly.
L. Connect the front turn signal/position light coupler
(right), and then fasten the front turn signal/position
light leads (right) with the holder as shown in the
illustration. The leads may be routed in any order.
M. To intake solenoid
N. Install fuse box 2 onto the rib of the front side
cowling inner panel (left).
O. Insert the projection on the wire harness holder
into the hole in the front cowling from the inside.
P. Position the plastic locking tie to the outside of the
intake solenoid vacuum hose and front turn signal/
position light lead (left).
2-28
CABLE ROUTING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Yzf-r1m seriesYzfr1lYzfr1lcYzfr1mlYzf1mlc

Table of Contents