NE-M Installation Guide
Installation
Follow all site engineering instructions. This section is provided only as a guide.
Preparation
Safety
Read and follow all safety statements, warnings, and precautions in the Safety section of this manual and manuals of all
other equipment before installing, maintaining or repairing the equipment.
Installation Tools
You will need the following tools.
•
Wire cutters and strippers
•
Heat shrink gun
•
Digital meter with an accuracy of ±0.02%
•
Screw drivers (flat-blade and Phillips)
•
ESD wrist strap
•
24 or 48V test load
•
Calibrated clamp-on dc current meter (0.1 ADC
sensitivity)
•
Torque wrench
•
Sockets -: SAE and metric
5/16", 7/16", 9/16", 19 mm, etc.
Equipment Identification
Identify the equipment you have received. Follow procedural steps which match the equipment being installed.
850050111
Issue 03 August 2017
•
12" extension for socket
•
Masonry drill kit as required
•
Compression tool for installation of various
compression lugs
•
Protective canvas
•
Insulating rubber mat
•
Standard insulated installation tools, screwdrivers,
etc.
•
Windows-based personal computer laptop (PC) and
cable to connect the PC communications port to
the local port of the controller or a CAT5 LAN cable.
(Optional. See the controller manual for more
information).
H5692448
16