Connect Interframe Signal Cables; Figure 22 Interframe Cables - GE Infinity M Series Installation Manual

High capacity with horizontal distribution, 13 u system with galaxy pulsar plus controller, 22u system with galaxy millennium ii controller, initial/supplemental frame, 22u system with supplemental frame and galaxy millennium ii controller
Table of Contents

Advertisement

NE-M Installation Guide

Connect Interframe Signal Cables

Step
`
P9
Connect 10 ft. RJ45 cable (847690799) into J2 on BIC 10.
1
Route to Millennium II Controller in Initial Frame.
Disconnect Factory RJ-45 cable from P9 and insert into Coupler.
Connect 10 ft. RJ45 cable (847690799) into J3 on BIC 10.
2
Route to Millennium II Controller in Initial Frame, insert in P9 connector of Millennium II Controller.
3
Connect 20 ft. 2-wire cable (850052873) bare ends to BIC 10 TB1: BL to SH-, W to SH+.
4
Route cable to Millennium II Controller P6.
5
Connect wires to butt splices on leade of P6 wire set – W to W-BL & BL to BL.
6
After applying power, configure Second battery shunt – see Configure Millennium II Controller section.
850050111
Issue 03 August 2017
Initial Frame
P6
Millennium II Controller

Figure 22 Interframe Cables

Connect RJ45 Cables
Connect Battery Shunt Cable
Action
Supplemental Frame
Battery Shunt Leads
to P6 Connector
BIC 10
Pin 10 - BL to Supp Frame BIC10 TB1-SH-
Pin 4 - W to Supp Frame BIC10 TB1-SH+
H5692448
 BIC 10
 Millennium II Controller
 Shunt RPM
BL W
Coupler
J3
J2
J1
Factory cable to
Rectifier Shelves
in Supplemental
Frame
24

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ne-m seriesH5692448

Table of Contents