NE-M Installation Guide

Connect Interframe Secondary Voltage Cables

Step
WARNING: Energy
Bus bars of systems with powered rectifiers or batteries connected provide hazardous
electrical energy.
Are Initial and Supplemental Frames both equipped with L635L Dual Voltage Distribution Panels in their bottom
Yes – go to step 1.
Two 4/0 AWG cables will be installed between the two frames, connecting their secondary buses together.
Systems with 24V rectifiers - install the cables on the 48V secondary buses.
Systems with 48V rectifiers - install the cables on the 24V secondary buses.
1
24V Secondary
Voltage Bus
System with 48V Rectifiers
850050111
Issue 03 August 2017
Action
L635L Dual Voltage Panels

Figure 20 L635L Dual Voltage Panel Location

shelf positions?
No – go to next section.
Existing 5/16" Bolts
2-Hole Lugs
Rear View

Figure 21 Secondary Voltage Bus

48V Secondary
Voltage Bus
System with 24V Rectifiers
H5692448
22