NE-M Installation Guide
• Bolt-in breakers must be installed before load connection is made.
• Bolt-in breakers can either be factory installed or field installed.
• Breaker kits include mounting hardware, load bus bars, and signal cables (alarm and shunt monitoring).
• Load Return bar may be at the top of the bolt-in panel or at the top of the frame.
• Kits include a load shunt that must be wired to an RPM Shunt Module to monitor the current (Millennium II
Controller only).
• Breaker kits are 1-pole, 2-pole, or 3-pole depending on the ampacity of the breaker.
Discard any excess hardware.
2-Pole Bolt-In Breaker
TPL-C Fuse Holder
850050111
Issue 03 August 2017
Bolt-In Breakers or TPL-C Fuse Holders
Battery
Bus
Fastons

Figure 62 Bolt-In Breaker or Fuse Holder Mounting

Figure 63 Bolt-in TPL-C Fuse Holder Wiring

Figure 64 Bolt-in Breaker Wiring

H5692448
Return
Bus
Fastons