Start Up Of Levelmeter 2000 - ABB S4Cplus Instruction

Hide thumbs Also See for S4Cplus:
Table of Contents

Advertisement

 3UHSDULQJ WKH HTXLSPHQW

2.2. Start up of Levelmeter 2000

 6WDUW XS RI /HYHOPHWHU 
/D\RXW DQG FRQQHFWLRQ RI /HYHOPHWHU 
The figure below shows the layout and connection of the Levelmeter 2000.
xx0200000126
A
B
C
D
E
3UHSDUDWLRQV  VHWWLQJ RI /HYHOPHWHU 
The procedure below details the initial preparations of the Levelmeter.
6WDUW XS RI /HYHOPHWHU
Shown below is an outline of how to initialize the Levelmeter 2000. Detailed procedures are
specified in the manual supplied by the manufacturer.
30
A
B
C
Connection sensor A
Connection sensor B
Connection SIO 1
Selection pointer
Measuring unit
$FWLRQ
1. Warm up the Levelmeter 2000 for at least 5 minutes before use, if turned off.
2. Set the measuring unit of the angle (DEG) to a sensibility of three decimals, e.g. 0.330º.
$FWLRQ
1. Connect the measuring unit and sensor using
the included cables.
2. Power up the Levelmeter 2000.
3. Connect sensors A and B.
E
D
1RWH
Power sources are detailed in
VRXUFHV RI /HYHOPHWHU  RQ SDJH
Detailed in
3RZHU
,GHQWLI\ VHQVRUV RQ SDJH
.
&RQWLQXHV RQ QH[W SDJH
3HAC 16578-1 Revision: E
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irc5

Table of Contents