Pr122/3 With Pr120/D; Detailed Information; Figure 9. Ep010 - Pr122/3 Wiring Diagram - ABB EP010 User's And Operator's Manual

Modbus / fbp interface
Table of Contents

Advertisement

3.2

PR122/3 with PR120/D

This user manual applies to the following EP010 SW versions:
1. PR122/3 FBP Interface v01.00 or higher
Order Code
1SDA060198R1
3.2.1
Wiring
3.2.2

Detailed information

The device type (PR122 or PR123) can be read from Parameter n. 2.
BINARY INPUT
Number of variables
118
Number of bytes
15
#
Name/Description
0 Parameter changed
1 Historical Measure Update
2 Waveform available
3 Signalling Reset
4 Any Alarm / Timing / Warning
5 Any Trip
6 CB tripped
7 CB connected / isolated
8 CB open / closed
9 CB undefined
10 No communic on Local Bus
11 Springs charged/discharged
12 Trip command fail
13 Local / Remote Operating Mode
14 Programming OK
15 Programming Fail
16 Internal Bus programming session
17 Test Bus programming session
18 Local Bus programming session
19 System Bus programming session
20 Test session
21 Test Unit connected
22 BT unit present
23 Signalling module present
24 Dialog unit present
25 Voltage unit present
26 Display Off for high temp
27 Waiting Trigger
28 Datalogger Triggered
29 Datalogger stopped
30 ActivedualSet
ABB SACE
Description
PR122/3 FBP Interface

Figure 9. EP010 - PR122/3 wiring diagram

Range
Units Multipler Coding
Isolated | Connected
CB Open | CB Closed
Discharged | Charged
Remote | Local
SET1 | SET2
EP010
S/N Product Type field (G)
B
Lenght
Range
[bytes]
default
0 | 1
0 | 1
0 | 1
0 | 1
0 | 1
1SDH000510R0001
WD LED number of flash
2
Notes
Read only PR123 only
Reset after read
Reset after read
Reset after read
Yes
Reset after read
Yes
Page N.
L2388
18/28

Advertisement

Table of Contents
loading

Table of Contents