Break-In; Break-In Operation For New Machine - Hitachi ZW 120-6 Operator's Manual

Table of Contents

Advertisement

Break-in Operation for New Machine

IMPORTANT: If the machine is heavily loaded without
performing break-in operation, damage to the
machine such as seizure and/or scoring may result by
which the machine life will be remarkably shortened.
Be sure to sufficiently perform break-in operation.
Machine life and performance will be greatly affected by the
extent of operation and maintenance of the machine during
the initial operation. Perform break-in operation for the first
100 hours.
 Check the machine before starting the engine.
 After starting the engine, sufficiently perform warm up
operation.
 Avoid sudden starting, sudden acceleration and sudden
braking while traveling the machine.
 Avoid heavy load for the front attachment.

BREAK-IN

2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents