Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station

Figure 2-6 Dimensions of a cement plinth

II. Casting Cement Plinth When a Battery Cabinet Is Configured
During the installation of the BTS3606A cabinet, the cement plinth is cast according to
the outline and dimensions shown in Figure 2-7. Space for installing a battery cabinet is
reserved on the cement plinth.
If a battery cabinet is added due to capacity expansion, a new cement plinth will be cast.
Figure 2-7 shows the total dimensions of cement plinths for battery cabinet and
BTS3606A cabinet. Note that two plinths must be at the same level.

Figure 2-7 Dimensions of cement plinth for battery cabinet and BTS3606A cabinet

2.3.3 Positioning the Base

To position the base, proceed as follows:
1)
Determine the installation position based on the predefined benchmark
dimensions in project plane design.
2)
Use a measuring tape to measure off the scribing points.
3)
Mark out the installation holes one by one as designed.
4)
Measure the distance between holes again.
Figure 2-8 illustrates the installation holes of expansion bolts during the installation of a
BTS3606A cabinet.
Chapter 2 Installing Cabinet Base or Channel Steel
Huawei Technologies Proprietary
2-6