ABB Relion 670 Series Commissioning Manual page 69

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UUS Rev. K
IEC140000133 V1 EN-US
Figure 9:
The following steps explain how to set the PMU Connection Tester parameters in order to establish an
IEEE C37.118 connection with the PMU:
1.
Set the IP stack on PMU Connection Tester to IPv4. Note that the default IP stack on PMU
Connection Tester tool is IPv6.
Bay control REC670
Commissioning manual
PMU Connection Tester tool
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Establishing connection and verifying the IEEE C37.118/1344 communication
IEC140000133-1-en.vsd
Section 9