Completing The Test; Average Power Transient Earth Fault Protection, Apptef; Verifying The Signals And Settings - ABB Relion 670 Series Commissioning Manual

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UUS Rev. K
Pickup Volt VBase
ANSIEQUATION2436 V2 EN-US
15.
Increase slowly the applied voltages of the previous two phases and note the reset value.
16.
Check that the trip output of the relay is connected to the input channel of the test in order to stop
the injection and measure the trip time.
17.
Inject symmetric three-phase voltages at their rated value and check that the STUV and PICKUP
signals reset as well as the trip signals of the function block (TRIP and TRUV).
18.
Instantaneously decrease the voltage in two phases simultaneously to a value 20% lower than the
set trip value (take into account the previous note if VRPVOC is configured in ACT with the
undervoltage seal-in feature).
19.
Measure the definite time delay for the TRUV and TRIP signals and compare it with the set value
tDef_UV.
20.
Check that pickup and trip information is stored in the event menu.
11.4.17.3

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.4.18

Average Power Transient Earth Fault Protection, APPTEF

Prepare the IED for verification of settings outlined in Section
11.4.18.1

Verifying the signals and settings

All of the following test will assume the following CT and VT ratios, and IBase and UBase settings:
CT ratio 1000A/1A
Phase-to-ground VT ratio 70kV/100V
Open Delta VT ratio (sqrt(3)*70kV)/100V
IBase=1000A
UBase=70kV
However, it must be noted that the secondary values given below can be used for most installations
because, usually:
1.
VT rated primary voltage value is equal to the UBase setting (70kV in the given example above)
2.
CT rated primary current value is equal to the IBase setting (1000A in the given example above)
Consequently these two quantities cancel each other in the calculations for the correct secondary
injected quantities. The frequency is not explicitly specified, use the rated frequency of the protected
network (either 50Hz or 60Hz) for signals given below.
Bay control REC670
Commissioning manual
_
VT
×
×
VTprim
100
3
If the VRPVOC function is used as an overcurrent protection with undervoltage
seal-in, it is necessary to first inject sufficient current to activate the STOC signal
before the under-voltage step is allowed to trip. In order to achieve that, apply
symmetric three-phase voltages at their rated value and then inject a current IA
that is 200% higher than the set tripping level. Then slowly decrease the voltage in
two phases simultaneously, until the STUV and PICKUP signals appear.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
sec
"Preparing the IED to verify
Section 11
Testing functionality by secondary injection
(Equation 19)
GUID-8A33AACE-7B89-4981-A872-78044BB1FD0D v2
GUID-079BCF22-469C-42EA-B857-E28154EC13D9 v1
settings".
GUID-36A0055E-CA32-4D85-A580-59032B3AC4AE v1
123

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents