ABB Relion 670 Series Commissioning Manual page 9

Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UUS Rev. K
10.2
Activating the test mode............................................................................................................ 77
10.3
Preparing the connection to the test equipment........................................................................77
10.4
Connecting the test equipment to the IED.................................................................................78
10.5
Releasing the function to be tested........................................................................................... 79
10.6
Verifying analog primary and secondary measurement............................................................ 80
10.7
Testing the protection functionality............................................................................................ 81
10.8
Forcing of binary input/output signals for testing.......................................................................81
10.8.1
Forcing concept.......................................................................................................................81
10.8.2
How to enable forcing..............................................................................................................82
10.8.2.1
10.8.2.2
10.8.3
How to change binary input/output signals using forcing........................................................ 82
10.8.3.1
10.8.3.2
10.8.4
10.8.4.1
10.8.4.2
10.8.4.3
Section 11
Testing functionality by secondary injection................................................. 89
11.1
Testing disturbance report......................................................................................................... 89
11.1.1
Introduction..............................................................................................................................89
11.1.2
Disturbance report settings..................................................................................................... 89
11.1.3
Disturbance recorder (DR)...................................................................................................... 89
11.1.4
Event recorder (ER) and Event list (EL).................................................................................. 90
11.2
Identifying the function to test in the technical reference manual .............................................90
11.3
Differential protection.................................................................................................................90
11.3.1
High impedance differential protection HZPDIF (87)...............................................................90
11.3.1.1
11.3.1.2
11.4
Current protection......................................................................................................................91
11.4.1
11.4.1.1
11.4.1.2
11.4.2
11.4.2.1
11.4.2.2
11.4.2.3
11.4.3
Instantaneous residual overcurrent protection EFPIOC (50N)................................................94
11.4.3.1
11.4.3.2
11.4.4
directionality) EF4PTOC (51N/67N)........................................................................................ 94
Bay control REC670
Commissioning manual
Enable forcing by using LHMI............................................................................................ 82
Enable forcing using TESTMODE function block...............................................................82
Forcing by using LHMI....................................................................................................... 83
Forcing by using PCM600.................................................................................................. 84
Undo forcing by using TESTMODE component.................................................................86
Undo forcing by using LHMI............................................................................................... 86
Undo forcing by using PCM600..........................................................................................86
Verifying the settings.......................................................................................................... 91
Completing the test............................................................................................................ 91
Measuring the trip limit of set values.................................................................................. 92
Completing the test............................................................................................................ 92
Function revision history.....................................................................................................92
Verifying the settings.......................................................................................................... 93
Completing the test............................................................................................................ 94
Measuring the trip limit of set values.................................................................................. 94
Completing the test............................................................................................................ 94
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Table of contents
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents