Installing Fbu - NEC N8100-2089F User Manual

Table of Contents

Advertisement

Chapter 2 Preparations
6.
Install the battery tray for RAID Controller using a single screw removed in Step 2.
7.
Connect the cable of additional battery to RAID Controller.
Align BLACK dot on the connectors of a Battery Control Cable and a Battery Connector on a RAID
controller.

1.11.3 Installing FBU

This section describes the procedure of installing a FBU for RAID Controller (N8103-161/168).
1.
Refer to steps 1 to 6 in Chapter 2 (1.3 Overview of Installation and Removal) for preparations.
82
 When you connect a Battery control cableto a RAID controller, align a
Important
black mark on each connector of the Battery control cable and the RAID
contoroller. If ou connect the cable in wrong direction, there is a risk to
demage parts on the Battery.
Express5800/T120e User's Guide
1. Installing Internal Optional Devices

Advertisement

Table of Contents
loading

Table of Contents