GE Dash Port 2 Service Manual page 37

Table of Contents

Advertisement

Power Up
Revision A
Installation: Connections
3
1. Slide the security lever to the far left position.
2. Verify the green-colored AC power indicator is illuminated on both
the docking station and the monitor.
3. Verify a green-colored communication indicator is illuminated on the
1
docking station
.
1
Some Dash 2000 monitors do not support the docking station's
Ethernet or auxiliary communication links. See
Monitors"
on page 2-9.
Dash Port 2 Docking Station
2000966-138
2
1
2
038A
"Compatible Dash
3-11

Advertisement

Table of Contents
loading

Table of Contents