GE Dash Port 2 Service Manual page 96

Table of Contents

Advertisement

054A
a
star washer
b
6-24
Part Lists, Drawings, and Replacement: Disassembly/Assembly of FRUs
047A
046A
055A
Dash Port 2 Docking Station
2000966-138
21. Gently insert the communication indicator light
pipe into the PCB connector.
22. Replace the equipotential lug.
a. Place the star washer onto the equipotential
lug.
b. Insert the lug into the threaded hole and
tighten the lug
23.
"Join the Top and Bottom Housings"
25
24. Insert the PCB ribbon cable friction connector.
on page 6-
Revision A

Advertisement

Table of Contents
loading

Table of Contents