GE Dash Port 2 Service Manual page 95

Table of Contents

Advertisement

b
a
a
Revision A
Part Lists, Drawings, and Replacement: Disassembly/Assembly of FRUs
a
053A
a
052A
048A
Dash Port 2 Docking Station
2000966-138
18. Route the light pipes to the PCB light pipe
connectors.
a. Insert the light pipes through the molded
guide holes.
b. Be sure to route the AC power indicator
light pipe BEHIND the plastic stand-off.
19. Gently push the light pipe lens into the lens
opening until it is seated.
20. Stabilize the PCB LED connector and gently
insert the AC power indicator light pipe.
6-23

Advertisement

Table of Contents
loading

Table of Contents