LG ACHH017VBAB Installation And Owner's Manual page 133

Air-cooled inverter scroll heat pump chiller
Table of Contents

Advertisement

Checklist for Chiller Installation, Page 1 of 2
3. Preparation Checklist
Is there any damage?
Are the bolts / nuts assembled properly and firmly attached?
Does the power specification match the product specification?
Is the wiring installed accurately?
Is the product installed correctly?
Are the protective devices of the electric circuit installed correctly in accordance with specifications
and codes?
Are all the terminal blocks connected properly?
Are all control plugs connected properly and seated at the terminal boards?
4. Check Water System
Are all valves connected to the chiller open?
Are all pipes connected accurately?
Are there any clogs in the drain pipe?
Are there any leaks?
Is the air within the system completely well discharged?
Is the water pump operating properly?
Confirm UI6-G has a closed contact during pump operation
(must be external signal).
Is the water flow switch operating?
Is the strainer installed on the piping to the evaporator?
Due to our policy of continuous product innovation, some specifications may change without notification. ©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Content
Content
Check
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Check
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
No
No
No
No
No
No
No
No
No

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents