Installation To Test Run Flowchart - LG ACHH017VBAB Installation And Owner's Manual

Air-cooled inverter scroll heat pump chiller
Table of Contents

Advertisement

INSTALLATION TO TEST RUN FLOWCHART

Figure 17: Installation to Test Run Flowchart.
Delivery and
Installation
26
Start
Instruction and installation of base
following IOM and all applicable codes
Delivery and Installation
Wiring and Piping
Set Control Address
Check before Initial Start
Check During and After Initial Start
Stop
Load Operation and Operation Adjustment
Prepare Operation Data
Analyze Water Quality
Guide Operation
End
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Test Operation