Installing The Ptt Unit - Yamaha F30B 2018 Service Manual

6bt, 6bg
Table of Contents

Advertisement

f.
Connect the battery jumper leads to the
PTT motor lead "1" to fully retract the trim
and tilt ram.
TIP:
If the trim and tilt ram does not move down eas-
ily, push on the trim and tilt ram to assist oper-
ation.
Ram
PTT motor lead
Green (G)
Retract
Blue (L)
g. Reverse the connection between the bat-
tery jumper leads and the PTT motor lead
"1" to fully extend the trim and tilt ram.
TIP:
If the trim and tilt ram does not move up easily,
pull on the trim and tilt ram to assist operation.
Ram
PTT motor lead
Blue (L)
Extend
Green (G)
h. Repeat steps f and g to fully extend and re-
tract the trim and tilt ram 4 or 5 times.
i.
Fully extend the trim and tilt ram.
1
G
L
Battery
(+)
(–)
1
L
G
Battery
(+)
(–)
j.
Remove the reservoir cap, and then check
the fluid level.
TIP:
If the fluid is below the proper level, add the
recommended PTT fluid. Repeat steps c–i until
the fluid is at the proper level.
k. Install a new O-ring and the reservoir cap,
and then tighten the reservoir cap to the
specified torque.
Reservoir cap
7 N·m (0.7 kgf·m, 5.2 lb·ft)
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲

Installing the PTT unit

1. Install:
• Bushing (to the PTT unit, clamp bracket,
and swivel bracket)
• PTT unit
• Shaft (upper side)
• E-clip
• Shaft (lower side)
• Washer
• Shaft bolt
• Ground lead
• Ground lead bolt
2. Route:
• PTT motor lead
• Plastic tie
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Route the PTT motor lead "1" through the
hole "a" in the clamp bracket "2" (STBD),
and then fasten the PTT motor lead to the
clamp bracket (STBD) with a new plastic
tie "3".
a
3
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
9-28
New
PTT unit
2
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

F40f 2018F30a 2018F40a 2018

Table of Contents