9.2
Shading and Sensitivity Corrections
Make shading and sensitivity corrections in the following sequence:
[1] Shading correction data recording initial setup
[2] IP exposure/dosage measurement
[3] IP conveyance
[4] Shading and sensitivity corrections
[5] Correction result verification
N NOTE N
Shading and sensitivity corrections must be made for both ST and HR.
[1] Shading correction data recording initial setup
(1) Start the M-Utility.
(2) Make preparations so that shading correction data can be recorded.
❍ ST
5. SCANNER UTILITY, 7. SHADING/SENSITIVITY, 1. REC MODE, 1. ST
❍ HR
5. SCANNER UTILITY, 7. SHADING/SENSITIVITY, 1. REC MODE, 2. HR
(3) Exit the M-Utility.
009-058-03
08.30.2002 FM3476
CR-IR347 Service Manual
MC - 254
MC - 254