I Checking the fuses
Measure the resistance value across the fuse. If the measured resistance value is 100 Ω or
greater, it is judged that the fuse has been blown.
Fuse
SUPPLEMENTARY NOTE
For the tester, its probe resistance (resistance value at the time of probe shorting) should be
measured before measurement, and compensation should be made with respect to the
measured value of the fuse.
I Action to be Taken When the Fuse Has Been Blown
Replace the fuses.
009-058-03
08.30.2002 FM3476
FR7H3453.EPS
CR-IR347 Service Manual
MC - 381
MC - 381