Chapter 2: Mount and Install the Smart-hopping 2.0 Access Point 1.4 GHz
2
3
2-22
Measure the tile and mark the middle
point in the area between the finished
an unfinished areas on the long side of
the tile.
Place the mounting rail against the
finished side of the tile, aligning the
center of the mounting rail with the
marks you made on the tile.
Make sure the side of the rail labeled
Cable Access
Below Mount
faces you.
DRAFT - 03 JUN 2022 13:32