Lubrication; Greasing The Machine; Electrical System Maintenance; Electrical System Safety - Toro e-Dingo 500 Operator's Manual

Compact tool carrier
Hide thumbs Also See for e-Dingo 500:
Table of Contents

Advertisement

Lubrication

Greasing the Machine

Service Interval: Before each use or daily (Grease
immediately after every washing.)
Grease Type: General-purpose grease
1.
Park the machine on a level surface and lower
the loader arms.
2.
Shut off the machine and remove the key.
3.
Clean the grease fittings with a rag.
4.
Connect a grease gun to each fitting.
Figure 29
5.
Pump grease into the fittings until grease begins
to ooze out of the bearings (approximately 3
pumps).
6.
Wipe up any excess grease.
Electrical System
Maintenance

Electrical System Safety

Disconnect the battery before making any repairs;
refer to
Using the Battery-Disconnect Switch (page
29).
Charge the battery in an open, well-ventilated
area, away from sparks and flames. Unplug the
charger before connecting or disconnecting the
battery. Wear protective clothing and use insulated
tools.
Using the
Battery-Disconnect Switch
1.
Park the machine on a level surface and lower
the loader arms.
2.
Shut off the machine and remove the key.
3.
Push the button on the latch and open the hood
cover.
4.
Turn the battery-disconnect switch to the ON or
OFF position to perform the following:
To energize the machine electrically, rotate
the battery-disconnect switch clockwise to
the ON position.
g392673
To de-energize the machine electrically,
rotate the battery-disconnect switch
counterclockwise to the OFF position.
29
Figure 30
g388891

Advertisement

Table of Contents
loading

This manual is also suitable for:

2221922219g

Table of Contents