Pre-Fab. Module Entry Requirements - Huawei FusionModule1000A20 Maintenance Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Maintenance Guide

3.3 Pre-fab. Module Entry Requirements

The following describes the requirements for working in the FusionModule1000.
Item
Before entry
Entry
preparations
Working in
the data
center
After all work
is finished
Check before
leaving
Follow-up
Procedure
Replace, maintain, and troubleshoot components of the FusionModule1000 only in
the presence of qualified engineers.
Issue 03 (2022-12-15)
Requirement
● Obtain the entry permit.
● The detailed operations are performed based on the
requirements specified by the manager of the
FusionModule1000.
● Obtain ESD clothes and shoes.
● Remove dust from tools and materials that need to be taken
into the data center, and make a record.
● Do not bring in forbidden items, such as storage devices,
cameras, or portable hard disks into the FusionModule1000.
● Only professional personnel are allowed to work in the data
center and only in the presence of designated personnel.
● Obtain permission from designated personnel and take
necessary precautions and preventive measures before
entering the FusionModule1000 and performing any
operation which may affect the normal running of the
FusionModule1000.
● Do not perform any unauthorized operations.
● Pack up the tools and surplus materials.
● Clean up and organize the equipment room environment
according to environment requirements.
● Accept the operations and make records about any
operations performed.
● Check the items to be taken out.
● Sign out.
● Return the ESD clothes and shoes.
● If any faulty component is replaced, dispose of the removed
faulty component.
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.