Huawei FusionModule1000A20 Maintenance Manual page 128

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Maintenance Guide
Figure 6-44 Installing the battery protective panel
Step 7 Check whether the new ASD batteries are working properly.
Turn on the standby power switch. If the power fault indicator is off, the batteries are working
properly.
----End
Issue 03 (2022-12-15)
NO TE
Copyright © Huawei Digital Power Technologies Co., Ltd.
6 Parts Replacement
121

Advertisement

Table of Contents
loading

Table of Contents