Step 4 Remove screws from the emergency light base using a Phillips screwdriver, and
remove the base.
Step 5 Install the new emergency light base and the panel in the same way.
Step 6 Remove the red pin, and reinstall the protective cover.
Figure 6-41 Position of the red pin
Step 7 Turn on the upstream switch of the emergency light power cable.
Step 8 Press the red button on the emergency light to check whether the new emergency
light is working properly.
If the new emergency light turns on, it is working properly.
----End

6.4.12 Replacing Batteries for the ASD Power Box

Prerequisites
Spare ASD power box batteries of the same model are available and functional.
Impact on the System
None
Preparations
Tools: Phillips screwdriver, protective gloves
Materials: spare ASD power box batteries
Documents: fire extinguishing device layout diagram (standard)
Skill requirement: fire engineer
Procedure
Step 1 Move the ASD power box batteries to the installation position indicated on the fire
extinguishing device layout diagram.