FusionModule2000 Smart Modular Data Center
Maintenance Guide
5.1.2 Synchronizing the Configuration Parameters
Procedure
Step 1 After replacing components, log in to the ECC800-Pro WebUI and choose
Maintenance > Parameter Sync to access the parameter synchronization page.
Step 2 Click Device type and select the component type from the drop-down list.
Step 3 Select the failure device in Source Device, select the reserved device in Target
Device, and click Submit to synchronize the configuration parameters of the
failure device to the reserved device.
----End
5.2 Replacing Power Supply and Distribution System
Components
5.2.1 Parts Replacement for the Precision PDF
For details about parts replacement for the precision PDF, see the "Parts
Replacement" section in the corresponding Precision PDC user manual.
Table 5-2 Replaceable parts of the precision PDF
No.
1
2
3
4
5
6
5.2.2 Parts Replacement for the Integrated PDF
For details about parts replacement for the integrated PDF, see section "Parts
Replacement" in the integrated PDF user manual.
Issue 02 (2022-07-30)
NO TE
If you need to replace any other parts, contact technical support.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Replaceable Part
MCB (Miniature circuit breaker)
MDU (Monitor display unit)
SPD (Surge protective device)
Fuse
Indicator
Power distribution detection module
5 Parts Replacement
62