Huawei FusionModule2000 Maintenance Manual page 58

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Maintenance Guide
Item
Availability
of the smart
rPDU
Aisle door
availability
Issue 02 (2022-07-30)
Method
Observe the
indicator of the
smart rPDU
switch.
Check whether
the door can be
opened and
closed smoothly.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Expected Result
The indicator of the
smart rPDU switch
is on.
The door can be
opened and closed
smoothly.
3 Routine Maintenance
Troubleshooting
If the switch indicator
is off, check the
branch load. After
checking that the
branch is not
overloaded, replace
the smart rPDU if the
switch indicator is
still off.
If the door cannot be
opened or closed
smoothly, check the
rail for obstacles and
clear the obstacles.