Figure 5-47 Water sensor components
(1) Water detector
(4) Conversion cable end B,
connecting to water the
detection rope
Impact on the System
The water leakage of the data center cannot be sensed.
Preparations
Procedure
Step 1 Replace the water detector.
1.
2.
3.
4.
Issue 02 (2022-07-30)
Material: water sensor
Skill requirement: hardware installation engineers
Remove the conversion cable at the conversion port for the water detector
and conversion cable.
Remove the communication cable from the water detector.
Connect a new water detector to the conversion cable.
Secure the new water detector.
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Conversion cable end A,
connecting to the water detector
(5) Water detection rope end A,
connecting to the conversion cable
5 Parts Replacement
(3) Conversion cable
(6) Water detection rope
101

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r022c10

Table of Contents