FusionModule2000 Smart Modular Data Center
Maintenance Guide
Step 7 (Optional) Adjust the magnet.
If the magnet does not work properly after power-on, check that:
1.
2.
3.
If any of the preceding conditions is not met, troubleshoot the magnet as follows:
1.
2.
3.
4.
Issue 02 (2022-07-30)
Figure 5-32 Installing a magnet
(1) White rubber washer
The magnet provides magnetic force by attaching magnetizable iron parts to
it.
The double-door magnetic lock is aligned with the magnet face-to-face.
No gap exists between the double-door magnetic lock and the magnet.
Check the circuit and rectify any circuit fault.
Adjust the magnet base and the door panel to align the magnetic lock with
the magnet face-to-face. Ensure that the deviation is minimum.
If a gap exists between the double-door magnetic lock and the magnet,
rectify the fault as shown by (1) in
If the magnet is not level, use a spacer shown by (2) in
the magnet levelness.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Figure
5-33.
5 Parts Replacement
Figure 5-33
to adjust