Huawei FusionDC1000A Commissioning Manual page 38

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
Syst
em
Cool
ing
syst
em
Issue 02 (2022-12-15)
Check
Operation Method
Item
Lithium
● Check the number of
battery
lithium batteries.
● Check lithium battery
connection.
● Measure the lithium
battery cell voltage using a
multimeter.
● Measure the lithium
battery string voltage
using a multimeter.
Phase
Verify that the L1, L2, L3, N,
sequence
and PE wires are connected
of indoor
for the indoor and outdoor
and
units in the correct phase
outdoor
sequence using a phase
unit cables
sequence meter.
Water
Check whether the water refill
refill for
valve is open, and whether
the smart
the water refill pressure
cooling
meets the requirement.
product
humidifier
Outdoor
Check the outdoor unit air
unit air
intake and exhaust vents.
intake and
exhaust
vents
Smart
Check the smart cooling
cooling
product compressor.
product
compresso
r pads
Copyright © Huawei Digital Power Technologies Co., Ltd.
3 Preparations for Power-On Commissioning
Expected Result
● The lithium batteries are
correct in quantity and
intact.
● Lithium batteries are
connected based on the
design requirements and
installed securely.
Lithium battery
electrodes are correctly
connected.
● The voltage is within the
rated voltage range of
lithium batteries. The
battery string voltage
equals the single battery
voltage multiplied by
the number of batteries.
● The voltage
measurement result
meets the requirement
of system power backup.
The phase sequence is
correct.
The water refill valve is
open, and the water refill
pressure is 0.1–0.7 MPa.
Outdoor unit air intake and
exhaust vents are not
blocked.
All smart cooling product
compressor pads are
removed.