Huawei FusionDC1000A Commissioning Manual page 82

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:
Table of Contents

Advertisement

FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
2.
Issue 02 (2022-12-15)
Figure 5-14 Opening the cover
Press the test button on the pneumatic switch to short-circuit the cables
inside to simulate an extinguishant release.
Figure 5-15 Pneumatic switch
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 System Commissioning
76

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r021c00

Table of Contents