FusionDC1000A Prefabricated All-in-One Data
Center
Commissioning Guide (IT Scenario)
2.
Issue 02 (2022-12-15)
Figure 5-14 Opening the cover
Press the test button on the pneumatic switch to short-circuit the cables
inside to simulate an extinguishant release.
Figure 5-15 Pneumatic switch
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 System Commissioning
76