Quick Installation And Commissioning Flowchart - ABB ACS560 Hardware Manual

0.75 to 160 kw, 1.0 to 215 hp
Hide thumbs Also See for ACS560:
Table of Contents

Advertisement

24 Introduction to the manual
symbol of the frame (R0...R8). The frame is marked on the type designation label
attached to the drive, see section

Quick installation and commissioning flowchart

Task
Identify the frame of your drive: R0...R8.
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and required cooling air
flow.
Unpack and check the drive.
If the drive will be connected to an IT (ungrounded) system,
check that the internal EMC filter and ground-to-phase varistor
are not connected. If the drive will be connected to a corner-
grounded TN system, check that the internal EMC filter is not
connected.
Install the drive on a wall.
Type designation label (page
46).
See
Type designation la-
bel (page 46)
Planning the electrical in-
stallation (page 67)
Technical data (page 139)
Mechanical installation:
Unpacking and examining
delivery, frames
R0...R2 (page
55),
Unpack-
ing and examining deliv-
ery, frames
R3...R4 (page
56),
Unpack-
ing and examining deliv-
ery, frames R5 (page
Unpacking and examining
delivery, frames
R6...R8 (page
59).
Operation principle and
hardware description:
Type designation la-
bel (page 46)
Electrical installation:
Checking the compatibil-
ity with IT (ungrounded)
and corner-grounded TN
systems (page 85)
Mechanical installa-
tion (page 51)
57),

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents